{"id":2322,"date":"2015-02-10T15:11:06","date_gmt":"2015-02-10T15:11:06","guid":{"rendered":"https:\/\/hoangthanhthanglong.vn\/en\/?p=2322"},"modified":"2023-05-26T09:52:07","modified_gmt":"2023-05-26T09:52:07","slug":"handover-ceremony-the-plan-of-the-heritage-site-after-the-construction-of-the-technical-infrastructure-and-landscape-of-the-18-hoang-dieu-archaeological-site","status":"publish","type":"post","link":"https:\/\/hoangthanhthanglong.vn\/en\/handover-ceremony-the-plan-of-the-heritage-site-after-the-construction-of-the-technical-infrastructure-and-landscape-of-the-18-hoang-dieu-archaeological-site\/","title":{"rendered":"Handover Ceremony  The plan of the heritage site after the construction of the technical infrastructure and landscape of the 18 Ho\u00e0ng Di\u1ec7u Archaeological Site"},"content":{"rendered":"<p style=\"text-align: justify\"><b>On 10 February 2015, at the 18 Ho\u00e0ng Di\u1ec7u Archaeological Site (Th\u0103ng Long Imperial Citadel), the Management Board of the Project to construct the new National Assembly building and Ba \u0110\u00ecnh Convention Hall and the Th\u0103ng Long &#8211; H\u00e0 N\u1ed9i Heritage Conservation Centre jointly organized the handover ceremony of the \u00a0plan of the heritage site after the construction of the technical infrastructure and landscape of the 18 Ho\u00e0ng Di\u1ec7u Archaeological Site.<\/b><\/p>\n<p style=\"text-align: center\"><a href=\"https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2323\" alt=\"congtrinh1\" src=\"https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh1.jpg\" width=\"600\" height=\"350\" srcset=\"https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh1.jpg 600w, https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh1-300x175.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p style=\"text-align: justify\">The Project to construct technical infrastructure and landscape of the 18 Ho\u00e0ng Di\u1ec7u Archaeological Site was ratified by the Hanoi People\u2019s Committee following Decision 2180\/Q\u0110 &#8211; UBND dated 22 April 2014. After nine months of construction, the project has completed the components and items exactly according to the design, meeting the deadline with guaranteed quality and compliance with the existing regulations and standards.<\/p>\n<p style=\"text-align: justify\">Components of the project include the demolition of structures that are either makeshift or unsuitable to the planning such as the former office of the Centre for Citadel Studies, the former office of the Board 5 for Protection and Care of the Health of Central-Level Officials, the former workplace of the car squad of the National Assembly Office, the makeshift storehouse for artifacts that need restoration, etc. The project also includes the levelling of the floor, construction of the yard, garden and internal road network, the landscaping of greenery, the establishment of a surface water supply and drainage system, lighting, the repairing of fences and entrance gates, etc. All the archaeological relics in this site have been refilled with sand by the Vietnam Institute of Archaeology according to standards. The system of shelters for Pits D6 &#8211; D4 have also been repaired and replaced.<\/p>\n<p style=\"text-align: center\"><a href=\"https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh2.jpg\"><img loading=\"lazy\" decoding=\"async\" alt=\"congtrinh2\" src=\"https:\/\/hoangthanhthanglong.vn\/en\/wp-content\/uploads\/sites\/2\/2015\/08\/congtrinh2.jpg\" width=\"600\" height=\"353\" \/><\/a><\/p>\n<p style=\"text-align: justify\">The completion of the Project to construct technical infrastructure and landscape for 18 Ho\u00e0ng Di\u1ec7u Archaeological Site means that the whole area now enjoys a system of infrastructure and beautiful landscape in harmony with the National Assembly. It also helps preserve the relics that have been unearthed and preserve intact the subterranean relics, thereby contributing to the promotion of the site\u2019s value and the service of the visitors, domestic and international alike. In doing so, the project provides the basis for the implementation of the second phase of the project, which aims to devise architectural design options, preserve and promote the values of 18 Ho\u00e0ng Di\u1ec7u Archaeological Site \u2013 a necessary step towards the master planning of the 118 Ho\u00e0ng Di\u1ec7u part of the central sector of the Th\u0103ng Long Imperial Citadel. The planning aims at conserving and turning the 18 Ho\u00e0ng Di\u1ec7u site and the Ancient Wall into a Culture-History Park, which is expected to promote the Outstanding Universal Value of the property, preserve sustainably the vestiges of structures, artifacts, unearthed archaeological sites while honoring the tangible and intangible cultural values and protecting them for future generations.<\/p>\n<p style=\"text-align: justify\">Once completed, the planning will help create a community cultural space that is harmonious with the overall architectural space and synchronous with the technical infrastructure of the Ba \u0110\u00ecnh Political Centre.<\/p>\n<p style=\"text-align: right\"><strong>Kim Y\u1ebfn<\/strong><br \/>\n<em>Th\u0103ng Long &#8211; H\u00e0 N\u1ed9i Heritage Conservation Centre<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 10 February 2015, at the 18 Ho\u00e0ng Di\u1ec7u Archaeological Site (Th\u0103ng Long Imperial Citadel), the Management Board of the Project to construct the new National Assembly building and Ba \u0110\u00ecnh Convention Hall and the Th\u0103ng Long &#8211; H\u00e0 N\u1ed9i Heritage Conservation Centre jointly organized the handover ceremony of the \u00a0plan of the heritage site &hellip;<\/p>\n","protected":false},"author":1,"featured_media":2323,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38,36],"tags":[],"class_list":["post-2322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-events"],"acf":[],"_links":{"self":[{"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/posts\/2322","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/comments?post=2322"}],"version-history":[{"count":0,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/posts\/2322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/media\/2323"}],"wp:attachment":[{"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/media?parent=2322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/categories?post=2322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hoangthanhthanglong.vn\/en\/wp-json\/wp\/v2\/tags?post=2322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}